Production buyers can plan. MRO engineers cannot. A shaft fails at 6am on a Monday. The machine it runs is central to a production process. The replacement shaft is a non-standard length in a grade that was not stocked by the previous site engineer. The plant manager wants it back on by tomorrow morning.
This is the scenario Parkside Steel is built for. 25 grades in stock. 13 saws running. No minimum order. Call us at 08:00, give us the grade, diameter and length. We cut it while you are making arrangements to collect or receive delivery. Same-day collection is available at our Sherwood Park site. Our own fleet covers much of the Midlands and North on scheduled routes 4–5 times per week.

