Production buyers can plan. MRO engineers cannot. A shaft fails at 6am on a Monday. The machine it runs is central to a production process. The replacement shaft is a non-standard length in a grade that was not stocked by the previous site engineer. The plant manager wants it back on by tomorrow morning.
This is the scenario Parkside Steel is built for. 20+ grades in stock. 13 saws running. No minimum order. Call us at 08:00, give us the grade, diameter and length. We cut it while you are making arrangements to collect or receive delivery. Same-day collection is available at our Sherwood Park site. Our own fleet covers much of the Midlands and North on scheduled routes 4–5 times per week.

